|
|||
| Home | Team Members | Projects | Services | Philosophy | Contact Us |
|---|
![]() |
ARENA BOULEVARD AT INTERSTATE 5 INTERCHANGE
Client: City of Sacramento Construction Value: $13.5 million Services Provided: Structure Inspection and Contract Administration Assistance |
|---|---|
The project involved the construction of multiple highway ramps, widening of the Interstate 5 freeway, new city streets, curb, gutter and sidewalk, landscaping, signalized intersections, street lights, several large storm drain systems, utility relocations, and a new 88 meter, 6-lane wide, cast-in-place pre-stressed (CIP/PS) concrete box girder bridge over Interstate 5.
|
Copyright (c) 2006 SAI Services All rights reserved. |
|---|