With seven years of construction inspection and administration experience on large infrastructure projects, with an emphasis on bridges and major roadways, Mr. Beck brings sound engineering judgment and knowledge. He has performed all of the duties of a Resident Engineer on two (2) major interchange projects and was the lead structure/civil inspector on a new $13.5 million freeway interchange project. As the primary inspector on the new interchange project he was involved in all of the elements of a large scale bridge and highway improvement project. He reviewed and inspected all phases of the falsework construction and removal, all aspects of bridge, roadway, freeway and ramp construction, including extensive utility and storm drain construction, and monitored major freeway traffic control operations. He gained extensive knowledge of large scale infrastructure construction operations, as well as proved his ability to inspect on multiple elements of a complex project. As the Assistant Resident Engineer and inspector on the two (2) freeway interchange improvement projects, one of which he was the sole inspector and administrator, Mr. Beck proved himself capable of effectively administering infrastructure projects. His ability to effectively document and administer the project makes him well suited for any public works contracts. Mr. Beck has consistently shown ability to learn quickly and work independently. He is eager to take on new challenges and has proven that he can excel in this type of an environment. Mr. Beck is well spoken and confident; however, it is his positive and gregarious attitude, his leadership skills, and his tireless work ethic that sets him apart. He also has a natural ability to quickly form positive and productive working relationships.
Selected Experience
CALTRANS ROUTE 15 MANAGED LANES PROJECT - San Diego, CA - Construction Value: $51.5 million. A three-mile long managed lanes project, including demolition and reconstruction of cast-in-place, pre-stressed (CIP/PS), concrete box girder bridges at three I-15 interchanges and the erection of thirteen retaining walls, two of which were tieback walls.
EIGHT MILE ROAD / I-5 INTERCHANGE PROJECT - Stockton, CA - Construction Value: $6.5 million. Widening Eight Mile Road from four (4) to seven (7) lanes, constructing two (2) tie-back walls under the I-5 undercrossing, widening all four (4) ramps, and constructing two (2) 250 meter long retaining .
I-5 / ARENA BOULEVARD INTERCHANGE PROJECT - Sacramento, CA - Construction Value: $13.5 million - Construction of cast-in-place pre-stressed (CIP/PS) concrete box girder bridge over I-5, of multiple highway ramps, widening freeway, new city streets, curb, gutter and sidewalk, landscaping, signalized intersections, street lights, several large storm drain systems, and utility relocations.